Plug & Abandonment

Plug & Abandonment

ISS Uses Hydraulic Workover Solutions For Platform Well Plug And Abandonments

Plug and Abandonment is defined as permanently closing a well. This usually happens when production has drained the reservoir of its resources or there is insufficient hydrocarbon potential to complete the well project. This is usually done by plugging the casing hole with cement. The main purpose of the abandonment part of the process is to restore the natural integrity of the formation that was created by the wellbore. If a well is improperly abandoned, contamination can happen to drinking water and other surfaces. One of the most efficient and safest way to complete a successful P&A is utilizing Hydraulic Workover. Our experienced team at ISS can help with all of your P&A needs. Our HWO Units are the most cost effective solution to your needs. Contact us today!

Plug & Abandonment Services:

  • Re-Abandonment
  • Temporary Abandonment
  • Isolating Reservoirs
  • Completion Removal
  • Pumping Cement Plugs
  • Installation of Bridge Plugs
  • Casing Window Milling
  • Casing Cement Bond Logs
  • Casing Cutting (Mechanical | Explosive | Abrasive)
  • Surface Casing Pulling and Removal
  • Casing Cutting Downhole
  • Casing Cutting at Surface
  • {"autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true"}